Capacity: Customized for job specific conditions, with experience in designing units over 40,000 lb/hr.
Fuel Capabilities: Customized for application
Pass: 3-pass
Tube Type: Smooth Tubes or Rifled Tubes
Steam Design Pressure: 150 - 300 psig
Hot Water Design Pressure: Section I vessels 150 - 250 psig
Resources
General Description
Mohawk Three Pass Heat Recovery units are designed with a large diameter furnace for waste gas inlet temperatures to 2400°F with 2.5” heat transfer tubes.
Features
- Customized design engineered for your specific solution.
- Available with dual chamber design or supplemental firing
- Temperatures to 2,400° F
- Roller-bearing supported single-hinged rear door for total fireside access (except wetback)
- Typical applications: low particulate levels, high inlet temperatures, and moderate gas side pressure drop.
Construction
- 12 gauge tubes
- 3/4″ tube sheets with 3/4″ ligament spacing
- Furnaces thicker than ASME code requirements
- Corrugated to help reduce the stresses associated with expansion and contraction
Quality
All Waste Heat Recovery Boilers are made with 12 gauge tubes, 3/4” tube sheets with 3/4” ligament spacing and furnaces thicker than ASME code requirements. All section I furnaces above 24” diameter are corrugated to help reduce the stresses associated with expansion and contraction.
Safety
Superior’s Waste Heat Recovery Boilers are trimmed and equipped with safeguards and code piping. Each boiler is inspected by independent code inspectors. Factory mounted and wired packaged burners are available from all burner manufacturers for supplemental firing.